GTU-16P Industrial Gas Turbine

GTU-16P gas turbine has been designed on the basis of the gas generator of the high performance PS-90 aircraft engine and GTU-12P gas turbine.

The gas turbine has higher cycle parameters (utilization of 14-stage compressor) and has a power turbine adapted to the existing gas turbine pumping packages.

The gas turbine is used in the GPA-16 "Ural" packaged modular-type gas pumping units manufactured by "Iskra", and for the reconstruction of the existing gas turbine pumping sets, such as GTK-10, GPA-C-16, GPU-16, GPU-10 and others.

GTU-16P gas turbines have perfectly promoted themselves while running at gas compressor stations of Russia.

It is unified and completely interchangeable with GTU-12P gas turbine, and inherits all the advantages and merits of the latter.

Developer - OJSC "Aviadvigatel"

Mass producer - OJSC "Perm Engine Company"

Specification
(ISO Conditions, loss-free, fuel: Methane (LHV=11958 kCal/kg)
Power turbine shaft output, MW16.47
Efficiency at power turbine shaft, % 37.0
Exhaust gas temperature, °Ñ466
Output speed, rev/min 5300
Exhaust gas flow, kg/s 57.2
Service life:
-overhaul interval, hr
-design life, hr
 
25000
100000

Advantages

Our gas turbine units feature:

  • high efficiency;
  • low oil consumption;
  • long service life;
  • reliable turboexpander starting;
  • low maintenance and repair cost during the entire life cycle;
  • comprehensive process automation;
  •  easy operation and maintenance;
  • completely factory-assembled; minimum cost and duration of installation and commissioning;
  • good environmental parameters.

The experience of GTU-16P gas turbine operation

 As of the beginning of January, 2009 such gas transport and gas production companies as "Gasprom" and "NOVATEK- Tarkosaleneftegas" operate 171 GTU-16P gas turbines, rated 16 MW.

The operating time of GTU-16P gas turbines for the year 2008 is 509 235 hours.
The total operating time of GTU-16P from the beginning of its operation is 2 150 541 hours.
The operating time of the high-time GTU 16P is 29 245 hours.

Please, see our REFERENCE LIST for more detailed field data.

Information request

If the products are of interest to you, please fill in the questionnaire.

Contact

93, Komsomolski prospect, Perm, 614990, Russia.

Mikhail A. Ignatiev
Perm Engine Company
Deputy Commercial Director-
Director Industrial Gas Turbines Program
Tel: +7 (342) 2409-444
Fax: +7 (342) 240-92-47
E-mail: mai@jetmotors.perm.ru

Mikhail F. Kharulin
Aviadvigatel
Deputy General Designer-
Chief Designer of Gas Turbine Drives
for Pumping Sets and
Facilities of Their ApplicationÒål.: (342) 281-48-99
Fax: (342)281-54-77
E-mail:  office@avid.ru

Konstantin V. Mikhaliov
Perm Engine Company
Head of Marketing dept.
Industrial GTU
Tel.: +7 (342) 240-91-94
Fax: +7 (342) 240-92-34
E-mail: mih-kv@pmz.ru