GTU-10P Industrial Gas Turbine

Application

GTU-10P industrial gas turbine is based on GTU-12P gas turbines and is used in the packaged modular gas pumping units, in gas boost compressor stations (BCS), and stations of underground gas storage (UGS), and in particular in GPA-10 BCS "Ural" and GPA-10 UGS "Ural" manufactured by "Iskra", and also, for retrofitting the existing GPA-C-6,3 packages and others.

The distinctive feature of the design are a high-speed power turbine that contributes to high efficiency of a gas compressor and a gas generator unified with GTU-12P gas turbine. The gas turbine inherited all advantages of GTU-12P.

Developer - OJSC "Aviadvigatel"

Mass Producer - OJSC "Perm Engine Company"

Specification
(ISO Conditions, loss-free, fuel: Methane (LHV=11958 kCal/kg) 
Power turbine shaft output, MW10.3
Efficiency at power turbine shaft, % 33.1
Exhaust gas temperature, °Ñ454
Output speed, rev/min 9000
Exhaust gas flow, kg /s 42.9
Service life:
Overhaul interval, hr
Design life, hr
 
25 000
100 000

 Advantages                                                         

 

Our gas turbine units feature:

  • high efficiency;
  • low oil consumption;
  • long service life;
  • reliable turboexpander starting;
  • low maintenance and repair cost during the entire life cycle;
  • comprehensive process automation;
  • easy operation and maintenance;
  • completely factory-assembled; minimum cost and duration of installation and commissioning;
  • good environmental parameters.

The experience of the gas turbine GTU-10P operation

 As of the beginning of January, 2009 such companies as "Gaspromdobychayamburg", "Gaspromdobychaorenburg", "Gaspromdobychaurengoy", "Gasprom PHG" as well as "NOVATEK-Tarkosaleneftegas" and "Nortgas" operate 42 GTU-10P gas turbines, including 26 gas turbines already put into operation while the others are being erected and commissioned.

The operating time of GTU-10P gas turbines for the year 2008 is 82 244 hours.
The total operating time of GTU-10P since operation start is 216 774 hours.
The operating time of the high-time GTU 10P is 24 889 hours.

Please, see our REFERENCE LIST for more detailed field data.

Information request

If you are interested in our equipment, please fill in the questionnaire in order to obtain further information.

Contact

93, Komsomolski prospect, Perm, 614990, Russia.

Mikhail A. Ignatiev
Perm Engine Company
Deputy Commercial Director-
Director Industrial Gas Turbines Program
Tel: +7 (342) 2409-444
Fax: +7 (342) 240-92-47
E-mail: mai@jetmotors.perm.ru

Mikhail F. Kharulin
Aviadvigatel
Deputy General Designer-
Chief Designer of Gas Turbine Drives
for Pumping Sets and
Facilities of Their Application
Òål.: (342) 281-48-99
Fax: (342) 281-54-77
E-mail:  office@avid.ru

Konstantin V. Mikhaliov
Perm Engine Company
Head of Marketing dept.
Industrial GTU
Tel.: +7 (342) 240-91-94
Fax: +7 (342) 240-92-34
E-mail: mih-kv@pmz.ru